DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-01 | 8403909000 | Other parts of central heating boilers, steel, is a preliminary manufacturing solid central heating boilers: SMART CASE 15 BOILER WITHOUT CASING LEFT SMART 20 Boiler body without casing RIGHT SMART 20 Boiler body without casing A | *** | *** | 7725 | 11538,05 | *** | ***** | ***** |
2017-09-04 | 8403909000 | Other parts of central heating boilers, steel, is a preliminary manufacturing solid central heating boilers:: SMART CASE 20 BOILER WITHOUT CASING LEFT - 12 pcs 20 SMART BODY BOILER WITHOUT CASING RIGHT - 8 PCS Ltd. "MF RUS 'absence | *** | RUSSIA | 4500 | 6752,14 | *** | ***** | ***** |
2017-09-05 | 8403901000 | PART central heating boilers of cast iron, NEW: Spare parts for boilers : Nipple-20 PCS. : JSC "Kirov Plant" fault 0 | *** | RUSSIA | 16 | 120,82 | *** | ***** | ***** |
2017-09-06 | 8403909000 | Other parts of central heating boilers, steel, is a preliminary manufacturing solid central heating boilers:: SMART CASE 15 BOILER WITHOUT CASING LEFT - 7 pcs 15 SMART BODY BOILER WITHOUT CASING RIGHT - 8 PCS Ltd. "MF RUS" otsuts | *** | RUSSIA | 2925 | 4537,57 | *** | ***** | ***** |
2017-09-07 | 8402900009 | Parts In-Line water tube steam boilers BSS-3000: The boiler body (BE3 burners, pumps, manages, and monitors I3MERITELNOY apparatus) for transferring heat from burnt fuel - water; Steam separators With mounting kit, FOR BODY BOILER B | *** | RUSSIA | 2520 | 42744,88 | *** | ***** | ***** |
2017-09-12 | 8414900000 | SPARE PARTS FOR FAN intended for ventilation of mines, tunnels, mines, air supply in steam boilers: Wentilator blast-VOGO RADIAL VDN-32B on a metal stand, including, serial number 2170112 complexes | *** | RUSSIA | 6380 | 17591,07 | *** | ***** | ***** |
2017-09-13 | 8402900009 | OF STEAM BOILER (UNIT) â„–1 thermal power plants "LONG FU 1" (boiler unit of CCI-600) ORDER 11047. NODE â„– 37 "PARTS MOUNTING (FINAL PEERCHEN PARTS â„–1)" - 1 SET. SUPPLY THIS GOES TO THE EXTENT ACCORDING picking WEDO. MOS | *** | RUSSIA | 64837.8 | 567000 | *** | ***** | ***** |
2017-09-13 | 8402900009 | OF STEAM BOILER (UNIT) â„–1 thermal power plants "LONG FU 1" (boiler unit of CCI-600) ORDER 11047. NODE â„– 39 "HEADSET, METAL PARTS MOUNTING bricking PARTS shunt DEVICES" -1 SET. SUPPLY THIS GOES TO THE EXTENT C. Ogle | *** | RUSSIA | 25849.6 | 138600 | *** | ***** | ***** |
2017-09-16 | 8481900000 | Parts of valves and similar appliances for pipes, boiler shells, tanks, vats or the like, reducing valves and thermostatically controlled valves (NOT FOR FIRE SAFETY) FOR TECHNOLOGY "JOHN DEERE": ARM BALL | *** | RUSSIA | 0.51 | 148,38 | *** | ***** | ***** |
2017-09-20 | 8403909000 | Other parts of central heating boilers, steel, is a preliminary manufacturing solid central heating boilers: SMART CASE 20 BOILER WITHOUT CASING RIGHT SMART 20 Boiler body without casing LEFT Ltd. "MF RUS" NO 9 LTD "MF | *** | RUSSIA | 2250 | 3373,53 | *** | ***** | ***** |