DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-04 | 7305110008 | Steel electric-welded longitudinal MANUFACTURED BY ARC Welding SAW FOR CONSTRUCTION oil pipelines "Nord Stream", AVAILABLE FOR TRAINING ON SITE WELDING CONTRACTOR. Diameter: 1153H41MM-12.27 METERS | ABSENT | ROMANIA | 14720 | 19570,25 | PLOIESTI | ***** | ***** |
2017-09-04 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", AVAILABLE FOR TRAINING ON SITE WELDING CONTRACTOR. Diameter: 1153H41MM-12.26 METERS | ABSENT | ROMANIA | 14710 | 19554,3 | PLOIESTI | ***** | ***** |
2017-09-05 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", diameter: 1153H34,6M-22, 000 meters. Made from steel grade DNV SAWL 485FD UNDER the norm | ChTPZ | FINLAND | 22500000 | 26297651,61 | KOTKA | ***** | ***** |
2017-09-05 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", AVAILABLE FOR TRAINING ON SITE WELDING CONTRACTOR. Diameter: 1153H41MM-12.04 METERS | ABSENT | ROMANIA | 14440 | 19217,96 | PLOIESTI | ***** | ***** |
2017-09-27 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", AVAILABLE FOR TRAINING ON SITE WELDING CONTRACTOR. Diameter: 1153H41MM-12.26 METERS | ABSENT | ROMANIA | 14710 | *** | PLOIESTI | ***** | ***** |
2017-10-06 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", diameter: 1153H34,6M-26, 000 meters, 1153H41MM-6240 METERS 1153H41MM-780 METERS 1153H41MM-520 METERS 1 | ChTPZ | FINLAND | 38000000 | 48267317,03 | KOTKA | ***** | ***** |
2017-10-11 | 7305110008 | NEW MAIN PIPE, steel, electrically welded, longitudinal welded, made of steel grade SAWL485FD, and with smooth interior AND OUTDOOR three-layer polyethylene coating. INTENDED FOR Construction of underwater gas pipeline under the project "Nord Stream AG 2" | ABSENT | NETHERLANDS | 20101 | 9603,58 | HEIJNINGEN | ***** | ***** |
2017-10-12 | 7305110008 | NEW MAIN PIPE, steel, electrically welded, longitudinal welded, made of steel grade SAWL485FD, and with smooth interior AND OUTDOOR three-layer polyethylene coating. SUITABLE FOR CONSTRUCTION OF UNDERWATER PIPELINE IN PROJECT ID 1153.0 X 30.9 | ABSENT | NETHERLANDS | 19009 | 9054,58 | HEIJNINGEN | ***** | ***** |
2017-10-13 | 7305110008 | PIPES Steel electric-welded fabricated by submerged arc welding, gas and oil pipelines FOR CONSTRUCTION "Nord Stream", diameter: 1153H30,9MM (one side 26,8MM) - 4 pieces 1153H41MM (one side 26,8MM) - 4 pieces 1 | ChTPZ | GERMANY | 2276973 | 4596880,22 | Mukran | ***** | ***** |
2017-10-14 | 7305110008 | NEW MAIN PIPE, steel, electrically welded, longitudinal welded, made of steel grade SAWL485FD, uncoated, suitable for construction of an underwater gas pipeline under the project "Nord Stream AG 2", ID 1153.0 X 30.9 MM - 2 PCS - 21.69 AM | ABSENT | NETHERLANDS | 19568 | 9358,50 | HEIJNINGEN | ***** | ***** |