DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-17 | 7307210009 | FLANGE. PART â„– 10230191. 9 PCS, DIMENSIONS:. Height 24 mm, outer diameter 54 mm .. DRAWING â„– 3421-0001.. Material: Stainless steel 17-4RN. FUNCTION: nondemountable PART OF TRANSMISSION SHAFT (welded) is used for collapsible | ABSENT | GERMANY | 0.51 | 477,67 | DZERZHINSK | ***** | ***** |
2017-11-02 | 7326909409 | Fasteners made of steel, stamped, INDUSTRIAL APPLICATIONS, FOR FIXING dischargers FOR EQUIPMENT INSTALLATION pyrolysis, LLC for their own needs "ZAPSIBNEFTEHIM" without alienating: | GCP | GERMANY | 1.5 | 147,85 | TOBOLSK | ***** | ***** |
2017-11-03 | 7318163009 | NUTS SCREWED, of stainless steel, NESAMOSTOPORYASCHIESYA FOR EQUIPMENT INSTALLATION pyrolysis, LLC for their own needs "ZAPSIBNEFTEHIM" | SULZER | GERMANY | 9.503 | 1817,28 | TOBOLSK | ***** | ***** |
2017-11-03 | 7318153009 | Screws headless, made of stainless steel, installation of equipment for pyrolysis, for their own needs Ltd. "ZAPSIBNEFTEHIM" | SULZER | GERMANY | 0.198 | 29,43 | TOBOLSK | ***** | ***** |
2017-11-03 | 7318290009 | PRODUCT WITHOUT thread, steel, installation of equipment for pyrolysis, pyrolysis, LLC for their own needs "ZAPSIBNEFTEHIM" | SULZER | GERMANY | 0.08 | 17,37 | TOBOLSK | ***** | ***** |
2017-11-03 | 7318190009 | PRODUCT threaded OF IRON OR STEEL, FOR THE EQUIPMENT INSTALLATION pyrolysis, LLC for their own needs "ZAPSIBNEFTEHIM" | SULZER | GERMANY | 6.83 | 586,52 | TOBOLSK | ***** | ***** |
2017-11-03 | 7318240009 | Dowel WITHOUT THREAD FOR EQUIPMENT INSTALLATION pyrolysis, LLC for their own needs "ZAPSIBNEFTEHIM" | SULZER | GERMANY | 1.665 | 308,65 | TOBOLSK | ***** | ***** |
2017-11-22 | 7326905000 | Drums of metal collapsible MADE OF IRON OR STEEL, FOR MANUAL unwinding PLASTIC PIPE SYSTEMS INSTALLATION WARM FLOOR PROKLIMA. METHOD OF MANUFACTURING - cutting, welding, painting, assembly | EHT sIEGMUND | GERMANY | 20.4 | 739,97 | BAD HONNEF | ***** | ***** |
2017-11-22 | 7326905000 | Drums of metal collapsible MADE OF IRON OR STEEL, FOR MANUAL unwinding PLASTIC PIPE SYSTEMS INSTALLATION WARM FLOOR PROKLIMA. METHOD OF MANUFACTURING - cutting, welding, painting, assembly | EHT sIEGMUND | GERMANY | 20.4 | 747,71 | BAD HONNEF | ***** | ***** |
2017-11-22 | 7307191000 | FITTING CAST ductile iron PIPE EQUIPMENT INSTALLATION pyrolysis NOT PREDN.DLYA ISPOLZ.V drinking water supply systems are not for oil and gas pipelines, NOT FOR FIRE. SAFETY NOT VOEN.NAZNACH., Ltd. for their own needs "ZAPSIBNEFTEHIM" | RFG | GERMANY | 27 | 287,83 | TOBOLSK | ***** | ***** |