DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-04 | 7308909809 | Steel elements from ferrous metals, form part of the permanently mounted METAL FRAME hothouse complex on the tide. 56 to the contract (the total area GREENHOUSE: 171958.00 M M2). METHOD OF STATIONARY MOUNTING: Combined | METEOR SYSTEMS BV | NETHERLANDS | 16216.2 | 31786,19 | DIDAM | ***** | ***** |
2017-09-06 | 7308909809 | OF STEEL OF IRON METAL STRUCTURES SUITABLE FOR ASSEMBLING (FRAME) greenhouse complex; Maximum dimensions (height / width / length) 7.93M / 175.57M / 443.11M, USEFUL AREA 63520M2 | places without | NETHERLANDS | 8526.88 | 26820,56 | VILLAGE FUN | ***** | ***** |
2017-09-06 | 7308909809 | OF STEEL OF IRON METAL STRUCTURES SUITABLE FOR ASSEMBLING (FRAME) greenhouse complex; Maximum dimensions (height / width / length) 7.93M / 175.57M / 443.11M, USEFUL AREA 63520M2 | places without | NETHERLANDS | 9828.2 | 48020,12 | VILLAGE FUN | ***** | ***** |
2017-09-06 | 7308909809 | OF STEEL OF IRON METAL STRUCTURES SUITABLE FOR ASSEMBLING (FRAME) greenhouse complex; Maximum dimensions (height / width / length) 7.93M / 175.57M / 443.11M, USEFUL AREA 63520M2 | places without | NETHERLANDS | 2924.13 | 27411,12 | VILLAGE FUN | ***** | ***** |
2017-09-07 | 7308909809 | OF STEEL OF IRON METAL STRUCTURES SUITABLE FOR ASSEMBLING (FRAME) greenhouse complex; Maximum dimensions (height / width / length) 7.93M / 175.57M / 443.11M, USEFUL AREA 63520M2 | places without | NETHERLANDS | 20172.72 | *** | VILLAGE FUN | ***** | ***** |
2017-10-12 | 7308909809 | Steel elements from ferrous metals, form part of the permanently mounted METAL FRAME hothouse complex on the tide. 9-EO-4 to the contract (the total area GREENHOUSE: 53,127.00 M2). METHOD OF STATIONARY MOUNTING: Combined | KUBO | NETHERLANDS | 258.37 | 845,23 | MONSTER | ***** | ***** |
2017-10-13 | 7308909809 | Steel elements from ferrous metals, form part of the permanently mounted METAL FRAME hothouse complex on the tide. 38 to the Contract (TOTAL AREA OF GREENHOUSE: 210,870 m2). METHOD OF STATIONARY MOUNTING: Combined | METEOR SYSTEMS BV | NETHERLANDS | 776.44 | 1324,24 | BREDA | ***** | ***** |
2017-10-28 | 7308909809 | METAL OF IRON OR STEEL: carriyin of composite constructions are intended for the construction of industrial greenhouse complexes AREA OF 32832.00 M2 supplied in incomplete disassembled assembly by anchor bolts, SCREW | ABSENT | NETHERLANDS | 19946.6 | 66621,02 | BERGSHENHOK | ***** | ***** |
2017-10-28 | 7308909809 | METAL OF IRON OR STEEL: carriyin of composite constructions are intended for the construction of industrial greenhouse complexes AREA OF 32832.00 M2 supplied in incomplete disassembled assembly by anchor bolts, SCREW | ABSENT | NETHERLANDS | 20600.59 | 66355,97 | BERGSHENHOK | ***** | ***** |
2017-11-02 | 7308909809 | Steel elements from ferrous metals, form part of the permanently mounted METAL FRAME greenhouse complexes. (TOTAL AREA OF GREENHOUSE: 10,000 m2). METHOD OF STATIONARY MOUNTING: | KUBO | NETHERLANDS | 21384.602 | 79368,44 | MONSTER | ***** | ***** |