DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-09 | 7308909809 | PARTS FOR TEAM METAL OF IRON OR STEEL (Raised floor with antistatic coatings for industrial premises): | ATFLOR | CHINA | 2.4 | 8,62 | SHANGHAI | ***** | ***** |
2017-10-12 | 7308909809 | METAL STEEL - RACK multicarrier team, intended for permanent installation in warehouses, EXPLODED VIEW - 4 pcs | not designated | CHINA | 168 | 312,50 | VLADIVOSTOK | ***** | ***** |
2017-10-14 | 7308905900 | METAL OF IRON OR STEEL: CHIMNEY STEAM solid fuel boilers for removing COMBUSTION PRODUCTS INTO THE ATMOSPHERE, 330SM * 150cm * 66cm, used is made of sheet fashion metal bending, and riveting, an offset shape. SET | *** | CHINA | 155 | 278,25 | MANCHURIA | ***** | ***** |
2017-10-27 | 7308905900 | SECTION BEAMS SC-1, made of galvanized steel sheet by rolling, wavy. It represents a part of prefabricated metal BEING guard barriers for highways. It is a key element BARRIER | XINCHENG | CHINA | 1940 | 1696,36 | BLAGOVESCHENSK | ***** | ***** |
2017-10-30 | 7308909809 | DESCRIPTION: Composite metallic KONTSTRUKTSII COLLECTED ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of a support, beams, tubes, sheets, plates, props, KOLO | not designated | CHINA | 798234 | 1578710,00 | Neryungri | ***** | ***** |
2017-10-31 | 7308909809 | Metal structures made of non-alloyed steel: columns, floor beams, welded open U-profile, with drilled holes ASSEMBLY by bolting. TOTAL 38 PCS | : Lack INFORMATION | CHINA | 12495 | 14045,09 | SUIFENHE | ***** | ***** |
2017-11-15 | 7308909809 | SUPPORT MOBILE COMMUNICATION (SUPPORTS DUAL-USE), ARE TEAMS hot galvanized steel structures, are used as towers for installation of equipment cellular communication operators and street lighting fixtures. Bearing consists of | not designated | CHINA | 51190 | 73850 | VLADIVOSTOK | ***** | ***** |
2017-11-22 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 377146.25 | 747991,25 | Neryungri | ***** | ***** |
2017-11-22 | 7308400009 | Hardware (FRAMES) for scaffolding - is a temporary pre-fabricated supporting facilities for external furnish with the low-rise construction, consists of a steel crossbeam different lengths between 1.3 M (vertical) | AJ | CHINA | 228.5 | 322,19 | VLADIVOSTOK | ***** | ***** |
2017-11-23 | 7308909809 | Prefabricated metal structure assembled ONCE, remains in a constant position. INTENDED FOR SUBSEQUENT INSTALLATION OF EQUIPMENT FOR THEM mining complex. Consists of: poles, beams, tubes, sheets, plates, props, the colonies B | NOT INDICATED | CHINA | 37495.56 | 74434,41 | Neryungri | ***** | ***** |