DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-12 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 2 | 88,19 | St PETERSBURG | ***** | ***** |
2017-10-12 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 6 | 264,98 | St PETERSBURG | ***** | ***** |
2017-10-16 | 7325999009 | SEALING STRIP STEEL, CAST WITH MECHANICAL processing unit for heating water gas boiler BRANDS RENDAMAX | ELCO, ARISTON | *** | 8.42 | 1571,15 | ST PETERSBURG | ***** | ***** |
2017-10-16 | 7307910000 | SET steel flanges intended to connect the tubes in the hydraulic system cascading heating water-heating gas boilers ARISTON MARKS | RENDAMAX, ARISTON | *** | 28.4 | 124,63 | ST PETERSBURG | ***** | ***** |
2017-10-18 | 7326909807 | Steel products, prefabricated - WATER STOCK UNIT Gas Geyser, is designed to transmit a push efforts to open the gas valve, METHOD FOR MANUFACTURING ASSEMBLY, ALL 110 PCS. | VATTI | CHINA | 1.13 | 3,30 | ST PETERSBURG | ***** | ***** |
2017-10-21 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 3 | 145,74 | St PETERSBURG | ***** | ***** |
2017-10-23 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 1 | 48,48 | St PETERSBURG | ***** | ***** |
2017-10-23 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 3 | 145,43 | St PETERSBURG | ***** | ***** |
2017-10-24 | 7326909801 | INDUSTRIAL ASSEMBLY FOR COMPLETING A / M "LB1A" PART-21014ED000, GASKET WATER PUMP PART MANUFACTURED STEEL MACHINING METHOD (cutting and turning), a plastic coated (More than 50%), with spiral CENTRAL Hole | NISSAN | JAPAN | 1 | 48,58 | St PETERSBURG | ***** | ***** |
2017-10-26 | 7307291008 | FITTING CONNECTION made of stainless steel, threaded NOT CAST (SET). Intended to connect the water and gas pipes with the device taking into account, heating systems, water supply, gas pipelines and other systems, see. APPENDIX About | DURATEC | CHINA | 700 | 1915,76 | ST PETERSBURG | ***** | ***** |