DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-08 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.706 | 53,78 | Bryansk | ***** | ***** |
2017-10-08 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.706 | 53,78 | Bryansk | ***** | ***** |
2017-10-12 | 8413703000 | Pump groups for central heating boilers, consists of a sealed pumps, centrifugal TYPE, is designed to supply water in the boiler, complete with the necessary fittings, fastening elements, gaskets and insulation, DO NOT | VAILLANT | *** | 7.12 | 211,66 | Bryansk | ***** | ***** |
2017-10-12 | 8413703000 | Pump groups for central heating boilers, consists of a sealed pumps, centrifugal TYPE, is designed to supply water in the boiler, complete with the necessary fittings, fastening elements, gaskets and insulation, DO NOT | VAILLANT | *** | 7.12 | 211,66 | Bryansk | ***** | ***** |
2017-10-29 | 8403909000 | PART central heating boilers - CURVED HYDRAULIC copper tubing with brass-THREAD PREREHODOM COMPLETE with plug, sealing rings, spring clamps, gaskets, LATCH connecting hydraulic elements inside the boiler, | VAILLANT | *** | 0.27 | 10,6 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | COIL PRIMARY ALUMINUM ASSEMBLY FOR WATER HEATING central heating boilers (PRINCIPLE OF HEAT HOT WATER-GAS), cpl. With graphite gasket, the nut (5 PCS.), A rubber sealing ring (2 pcs.), Clips (2 pcs.), | VAILLANT | *** | 10.2 | 149,74 | Bryansk | ***** | ***** |
2017-10-29 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.728 | 51,15 | Bryansk | ***** | ***** |
2017-10-29 | 8419500000 | COIL PRIMARY ALUMINUM ASSEMBLY FOR WATER HEATING central heating boilers (PRINCIPLE OF HEAT HOT WATER-GAS), cpl. With graphite gasket, the nut (5 PCS.), A rubber sealing ring (2 pcs.), Clips (2 pcs.), | VAILLANT | *** | 10.2 | 149,74 | Bryansk | ***** | ***** |
2017-10-29 | 8403909000 | PART central heating boilers - CURVED HYDRAULIC copper tubing with brass-THREAD PREREHODOM COMPLETE with plug, sealing rings, spring clamps, gaskets, LATCH connecting hydraulic elements inside the boiler, | VAILLANT | *** | 0.27 | 10,6 | Bryansk | ***** | ***** |
2017-10-29 | 8481109908 | REDUCING GAS VALVE FROM ALUMINUM ALLOY FOR PRESSURE REGULATION central heating boilers, with electric and assembly kit (rubber gaskets, sealing rings AFM34 (2 pcs), screws made of stainless. STEEL) | VAILLANT | *** | 0.728 | 51,15 | Bryansk | ***** | ***** |