DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-10-19 | 8419893000 | INSTALLATION FOR VACUUM COATING BY fumes from resistance heating, is designed for applying coatings of metal on closures by vacuum deposition of metals from the vapor phase, it comes in disassembled with | not designated | CHINA | 10070 | 48991,2 | SHENZHEN | ***** | ***** |
2017-10-19 | 8419893000 | INSTALLATION FOR VACUUM COATING BY fumes from resistance heating, is designed for applying coatings of metal on closures by vacuum deposition of metals from the vapor phase, it comes in disassembled with | not designated | CHINA | 10070 | 48991,2 | SHENZHEN | ***** | ***** |
2017-10-23 | 8419899890 | Water cooling unit, used with welding machine and designed to prevent overheating of the welding torch. The division consists of PUMP, cooling fan, radiator heat sink. MAINTAINING NORMAL TEMPERATURE BURNER OSUSCHEST | LEOPARD | CHINA | 310 | 3161,31 | SHENZHEN | ***** | ***** |
2017-10-23 | 8419899890 | Water cooling unit, used with welding machine and designed to prevent overheating of the welding torch. The division consists of PUMP, cooling fan, radiator heat sink. MAINTAINING NORMAL TEMPERATURE BURNER OSUSCHEST | LEOPARD | CHINA | 310 | 3161,31 | SHENZHEN | ***** | ***** |
2017-10-26 | 8419899890 | CABINET HEATING AND DOME BELT, FAN BELT STABILIZATION - part of the extrusion PRODUCTION LINE: | NOT INDICATED | CHINA | 4680 | 10470,92 | SHENZHEN | ***** | ***** |
2017-10-26 | 8419899890 | LABORATORY EQUIPMENT WITH ELECTRIC heating, a test MATERIALS IN THE PROCESS OF CHANGE OF TEMPERATURE: Testing climatic chamber with cooling and air heating | YUANYAO | CHINA | 850 | 14184,56 | Shenzhen | ***** | ***** |
2017-10-26 | 8419899890 | CABINET HEATING AND DOME BELT, FAN BELT STABILIZATION - part of the extrusion PRODUCTION LINE: | NOT INDICATED | CHINA | 4680 | 10470,92 | SHENZHEN | ***** | ***** |
2017-10-26 | 8419899890 | LABORATORY EQUIPMENT WITH ELECTRIC heating, a test MATERIALS IN THE PROCESS OF CHANGE OF TEMPERATURE: Testing climatic chamber with cooling and air heating | YUANYAO | CHINA | 850 | 14184,56 | Shenzhen | ***** | ***** |
2017-11-07 | 8708913509 | RADIATORS NEW, NOT MILITARY FOR REPAIR AND MAINTENANCE OF MOTOR VEHICLES, NOT FOR THE INDUSTRIAL ASSEMBLY, OF BASE METAL. APPLY IN COOLING / HEATING CAR: | MILES | CHINA | 5173.23 | 43689,11 | Shenzhen | ***** | ***** |
2017-11-07 | 8708919909 | Of the radiator, new, non-military purposes, of base metal condenser. USED ​​IN HEATING AND AIR CONDITIONING. Are installed in the front of the car before a radiator cooling. Supplied with | MILES | CHINA | 694 | 6051,19 | Shenzhen | ***** | ***** |