DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-06 | 8403909000 | UNIT 18kW Lamela (2ZVEZDY) ART: 8718643234 - 280 PCS. BLOCK manifold heat exchangers fins. HEATING 18 KW. IS FINNED Lamela COPPER COIL, consisting of five copper pipes and soldered inside them COPPER: Turbo | *** | TURKEY | 507.92 | 6368,8 | *** | ***** | ***** |
2017-09-06 | 8403909000 | UNIT 24kW Lamela (2ZVEZDY) ART: 8718643300 - 3360 pcs. BLOCK manifold heat exchangers fins. HEATING 24 KW. IS FINNED Lamela COPPER COIL, consisting of five copper pipes and soldered inside them COPPER: Turbo | *** | TURKEY | 7920 | 95158,69 | *** | ***** | ***** |
2017-09-07 | 8403909000 | PART central heating boilers - SET reconfigure VUW The VU (FROM Turbofan boiler in the single-loop), it consists of a brass BENT PIPES (. 5 pieces) per set. FASTENING ELEMENT WITH STEEL (1 piece.), Harness, brass corners (1 piece.): The IN | *** | SLOVAKIA | 11.88 | 513,98 | *** | ***** | ***** |
2017-09-08 | 8403909000 | PART central heating boilers, except boilers HEADING 8402: Turbolators BOILER REX 15 ... 30. Permanently mounted in the flue pipes Single-pass fire-tube heat exchangers, and is designed to create TURBULENT FLOW PRO | *** | ITALY | 27.5 | 314,5 | *** | ***** | ***** |
2017-09-10 | 8403909000 | PART central heating boilers - curved copper pipe with a brass threaded fitting and brass union nut, cpl. With 2 pad of AFM34, it is used to supply gas within the boiler,: the Indus. UP-TO KE of the pallet "VAILLANT GMBH" VAILLANT 002,023 | *** | GERMANY | 1.64 | 60,74 | *** | ***** | ***** |
2017-09-10 | 8403909000 | CENTRAL HEATING BOILER OF COMPOSITION The migration VUW VU (IZ DVUHKONTURNOGOKOTLA In single-loop) consists of a brass BENT PIPE (5 pieces.) Per set. FASTENING ELEMENT WITH STEEL (1 piece.), Harness, brass corners (1 piece.) PROTHERM | *** | GERMANY | 1.08 | 47,2 | *** | ***** | ***** |
2017-09-11 | 8403909000 | PART central heating boilers, NOT MILITARY TOTAL ,:-349SHT. DRAIN PIPE-boiler flue COAXIAL (inside the pipe -. ALU, the outer tube -.. LAYER) FOR EVACUATION OF COMBUSTION (aspiration is) / airflow top for diameter 60 / 100mm PIPE ADAPTER | *** | ITALY | 541.51 | 5296,22 | *** | ***** | ***** |
2017-09-12 | 8403909000 | PART central heating boilers - SET reconfigure VUW The VU (FROM Turbofan boiler in the single-loop), it consists of a brass BENT PIPES (. 5 pieces) per set. FASTENING ELEMENT WITH STEEL (1 piece.), Harness, brass corners (1 piece.): The IN | *** | GERMANY | 1.08 | 47,02 | *** | ***** | ***** |
2017-09-12 | 8403909000 | UNIT 18kW Lamela (2ZVEZDY) ART: 8718643234 - 560 PCS. BLOCK manifold heat exchangers fins. HEATING 18 KW. IS FINNED Lamela COPPER COIL, consisting of five copper pipes and soldered inside them COPPER: Turbo | *** | TURKEY | 1015.84 | 12936,22 | *** | ***** | ***** |
2017-09-12 | 8403909000 | UNIT 24kW Lamela (2ZVEZDY) ART: 8718643300 - 3080 pcs. BLOCK manifold heat exchangers fins. HEATING 24 KW. IS FINNED Lamela COPPER COIL, consisting of five copper pipes and soldered inside them COPPER: Turbo | *** | TURKEY | 7260 | 88592,45 | *** | ***** | ***** |