DATE | HS_CODE | Product Description | Trademark | Country | Net Weight | Statistical Cost | Place | Shipper Name | Consignee Name |
---|
2017-09-06 | 8419500000 | HEAT FOR REPAIR OF PREVIOUS VVEZONNYH gas boilers BRAND "MIZUDO": SECONDARY COIL: COIL CORE: CORE COIL: COIL CORE: CORE COIL POWTEK INTERNATIONAL HOLDINGS LIMITED ZHONGSHAN | *** | CHINA | 31.7 | 542,46 | *** | ***** | ***** |
2017-09-11 | 8419500000 | HEAT FOR A central heating boiler MOD. LYNX LYNX HK 24 as spare parts COIL PRIMARY HEATING BOILER, copper solder, 28 ITC SAUNIER DUVAL PROTHERM ABSENT ABSENT 0020118599 2 | *** | CHINA | 8.74 | 141,49 | *** | ***** | ***** |
2017-09-11 | 8419500000 | HEAT EXCHANGER FOR USE IN BOILERS MOD.RYS CENTRAL HEATING LYNX HK 24 as spare parts SECONDARY COIL HEATING BOILER (PRINCIPLE OF HEAT EXCHANGE WATER WATER), stainless steel. STEEL, Payan, 24 kW SAUNIER DUVAL PROTHERM NO 002 | *** | CHINA | 5.13 | 153,95 | *** | ***** | ***** |
2017-09-26 | 8419500000 | SPARE PARTS FOR DOMESTIC Boilers "OASIS" FOR HEATING SYSTEMS: the main heat exchanger (coil) -MEDNY heat exchanger to heat the water in the combustion chamber boilers that are installed above the burner 2 pieces. : GUANGDONG VANWARD NEW ELECTRIC CO, LTD.. | *** | CHINA | 6.44 | 52,86 | *** | ***** | ***** |
2017-09-27 | 8419500000 | SPARE PARTS FOR DOMESTIC Boilers "OASIS" FOR HEATING: heat exchanger to heat water- made of copper, with a tube CONNECTION: BM L200-2 pcs .; PLATE HEAT DHW, made of steel plates ot hardened: HN | *** | CHINA | 12 | 234,53 | *** | ***** | ***** |
2017-10-09 | 8419500000 | SPARE PARTS FOR DOMESTIC Boilers "OASIS" FOR HEATING: heat exchanger to heat water- made of copper, with a tube CONNECTION: L160 BM-5 pcs .; PLATE HEAT DHW, made of steel plates ot hardened | ABSENT | CHINA | 19.25 | 281,08 | BEIJIAO | ***** | ***** |
2017-10-09 | 8419500000 | SPARE PARTS FOR DOMESTIC Boilers "OASIS" FOR HEATING: heat exchanger to heat water- made of copper, with a tube CONNECTION: L160 BM-5 pcs .; PLATE HEAT DHW, made of steel plates ot hardened | ABSENT | CHINA | 19.25 | 281,08 | BEIJIAO | ***** | ***** |
2017-10-18 | 8419500000 | HEAT is designed to transmit heat generated by burning gas within the combustion chamber gas boiler to the heat HEATING SYSTEM, are taking place within TRUBOK.TEPLOOBMENNIK finned copper tubing and brazed copper | ELECTROLUX | CHINA | 640.828 | 8950,85 | HUANGPU | ***** | ***** |
2017-10-18 | 8419500000 | HEAT is designed to transmit heat generated by burning gas within the combustion chamber gas boiler to the heat HEATING SYSTEM, are taking place within TRUBOK.TEPLOOBMENNIK finned copper tubing and brazed copper | ELECTROLUX | CHINA | 640.828 | 8950,85 | HUANGPU | ***** | ***** |
2017-10-31 | 8419500000 | HEAT, mode of operation: heat the water in the combustion chamber of the boiler, converts the energy from burning gas in VODY.NOMINALNAYA HEATING POWER 1.2 KW. APPLY TO HEATER gas flowing: | RODA | CHINA | 20.14 | 431,59 | FACTORY CHINA | ***** | ***** |